Located within the borders of Osmaniye Province, the Gökçedağ Wind Power Plant (WPP), with an installed capacity of 135 MW, was added to our portfolio in 2025. The first turbine at the project was commissioned in 2009, and the plant became fully operational in 2010.
Located in the Bahçe district of Osmaniye, the plant comprises 54 GE wind turbines as of 2025. Each turbine has a capacity of 2.5 MW and is a GE 2.5 XL model.