The R3 – Malatya-1 Wind Power Plant project, located within the borders of Malatya, Erzincan, and Sivas provinces, was completed and commissioned in September 2025. The plant, situated near the Şağıluşağı area of Arapgir district in Malatya, consists of 12 Nordex N163 wind turbines, each with a capacity of 7 MW.
With a total installed capacity of 84 MWm / 80 MWe, the plant is expected to generate 280 GWh of electricity annually.